Project Overview
TIMELINE: RUIDOSO SEWER LINE INTERCEPTOR PROJECT
Challenges
The existing interceptor is located in close proximity to the Rio Ruidoso, which presents the following challenges:
- Accessibility to interceptor for construction activities
- High ground water
- Prevalence of rock in underlying soils
- River channelization has increased flood hazards and degraded the river channel
Benefits
- Potential reduction in infiltration and inflow into the collection system
- Extension of the useful service life of the collection system
- Prevention of damage to the interceptor from future flood events
- Improved flow mechanics through interceptor
Schedule
Estimated Design Completion: December 2018 Estimated Permitting Requirements: 4 to 6 months (to occur in conjunction with design.)
Estimated Construction Duration: 12 to 15 months Estimated Construction Completion Date: June 2020